Railwaygazette.com

Join us on Facebook Join us on Facebook!
Follow us on Twitter Follow us on Twitter!

Poll

Industry Poll

Are local jobs more important than value for money in rolling stock procurement?
Yes
No
Don't know

News

Getting the boot

By: 01 September 2006

SATEBA will be displaying a concrete turnout bearer on the joint Vossloh Cogifer and Consolis stand. The sleeper maker is working with Vossloh Cogifer to install slab track with three turnouts on a 3 km section of TGV Est, and has supplied its SAT312 booted sleepers for use on 20 km of track on Section 2 of the Channel Tunnel Rail Link, where trains will run at up to 230 km/h.

The booted sleepers are a development of Sateba's proven Stedef design, which fits twin or monobloc concrete sleepers with rigid boots and resilient pads. Constructed using top-down methods, the system is designed for a maximum speed of 350 km/h with 170 kN axleloads, or 250 km/h and 230 kN.

The stiffness of the track can be adjusted, a feature which is being used to create stiffness transition zones where required on the CTRL.


Weekly E-Newsletter

Register here to receive the free Railway Gazette Weekly e-newsletter and keep up to date with the latest industry news.

Events

All events

Join us on Facebook

Google

Translate this page in your language:

select your language