Railwaygazette.com

Join us on Facebook Join us on Facebook!
Follow us on Twitter Follow us on Twitter!

Poll

Industry Poll

Are local jobs more important than value for money in rolling stock procurement?
Yes
No
Don't know

News

Madrid resignals two lines

21 September 2008

SPAIN: Under a programme costing €104m, Madrid Metro is resignalling lines 1 and 6 with communications-based train control to increase capacity by 50% and 31·8% respectively. So far, 94 km of radiating cable has been laid, as well as over 200 km of optic fibre, with CBTC equipment being fitted to 93 six-car trainsets.

Balises and radio equipment are being installed on Line 1 which is 24 km long with 33 stations. The commissioning of CBTC is expected to cut headways by 31% and enable up to 23500 pass/h per direction to be carried in place of the current limit of 15600.

CBTC installation forms part of the 2007-10 modernisation programme for the 23·5 km Line 6 serving 28 stations, where capacity should be increased from 26000 to over 34000 pass/h per direction. The first Series 5000 trainset equipped with CBTC began running in commercial service on Line 6 on July 7.

Investment to date totals €221m, including new rolling stock, reinforcing the traction power supply and improvements to lighting and ventilation (RG 6.08 p351).


Weekly E-Newsletter

Register here to receive the free Railway Gazette Weekly e-newsletter and keep up to date with the latest industry news.

Events

All events

Join us on Facebook

Google

Translate this page in your language:

select your language