Railwaygazette.com

Join us on Facebook Join us on Facebook!
Follow us on Twitter Follow us on Twitter!

Poll

Industry Poll

Are local jobs more important than value for money in rolling stock procurement?
Yes
No
Don't know

News

Share |

Spanish rail spend increasing

05 November 2007

INVESTMENT and support for the national rail network from the Spanish government will total €8·15bn in 2008, up 5% on 2007 and representing 41% of total spending on transport. Renfe is to receive €1035m, of which €545m will be operating subsidy for suburban passenger operations.

 

Investment in the suburban networks will total €463m, up by 49·4% on the current year, of which €244m will be spent on infrastructure and rolling stock in Barcelona. The Ministry of Development and its agencies are to spend €832m on maintenance next year, up 5·8% on 2007.

At €4bn, high speed line construction will account for almost 50% of railway spending in 2008. The route between Madrid and Valencia is to receive €979m, the line from Lleida to the French border €739m and the route north from Valladolid to León and Oviedo €506m. A total of €580m has been allocated to the line between Madrid and Galicia in northwest Spain.

On September 24 ADIF President Antonio González signed a 50-year loan agreement with the European Investment Bank, releasing a tranche of €300m for the Madrid – Valladolid high speed line. Due to open on December 22, this route has cost an estimated €3·6bn to build, of which €1·8bn has been provided by the European Union and €500m by EIB. A second tranche of €800m from the bank is under consideration.

The final contract awards for the Madrid – Valladolid route include a €76·2m package of works to install a second 1435 mm gauge track over the 5·4 km between the River Duero and El Pinar de Antequera, awarded to Corsán-Corviam, Begar and Zarzuela. OHL, Aldesa, Sando, Copasa and Tableros y Puentes have been awarded a €60m contract to install ventilation and safety systems in the San Pedro tunnels, including CCTV, emergency lighting and fire-fighting equipment.

  • On the route to the French border, a joint venture of FCC, Dragados, Tesca and Copisa has been awarded a €278·6m contract to build the 3·6 km section through Girona, including a new station and 2·9 km in bored tunnel. Civil works on the 7·5 km section to Figueres, including 560 m on viaduct, have been awarded to Sacyr, Cavosa and Scrinser for €77m.

Weekly E-Newsletter

Register here to receive the free Railway Gazette Weekly e-newsletter and keep up to date with the latest industry news.

Events

All events

Join us on Facebook

Google

Translate this page in your language:

select your language