Opened 1881, modernised five-route tramway network serving 99 stops.
On December 12 2021 Line 3 was extended south from Haunstetten (Inninger Straße) beyond the city boundary to Königsbrunn (4·7 km, 7 stops). Augsburg’s tram network is gradually being turned over to reserved track.
Work on a sixth route (Line 5: 3·5 km new alignment with 4 new stops) running northwest to Klinikum BKH began in 2016; a tunnel under the main station is also being built. Several other extensions are being planned.
- Address
- Stadtwerke Augsburg Holding GmbH (SWA)
Hoher Weg 1
86152 Augsburg
Bayern
Germany - Phone
- +49 821 6500 5989
- Fax
- +49 821 6500 5704
- verkehr@sw-augsburg.de
- Website
- www.sw-augsburg.de
Traffic
| Year | Passenger journeys (million) |
|---|---|
| statistic for tram only | |
| 2018 | 43·20 |
| 2017 | 42·46 |
| 2016 | 42·45 |
| 2015 | 40·53 |
| 2014 | 40·16 |
Network data
- Gauge
- 1000 mm
- Length
- 49·9 km
- Electrification
- 49·9 km - 750 V DC
- Rolling stock
- 102 LRV/tram cars (inc. 11 cars ordered from Stadler on October 1 2019)





