First line opened 1913. Network comprises 6 lines with 85 stations. See Buenos Aires network map.

Since 1994 the metro has been operated by the Metrovias private-sector consortium under concession, and since 2013 this has been let on a year-by-year basis. Infrastructure is owned by Subterraneos de Buenos Aires, which is tendering for a multi-year operating concession. Metrovias also operates the Urquiza suburban railway running from metro Line B at Federico Lacroze to General Lemos. Light rail Line P opened 1987, and an experimental light rail route serves the Puerto Madero redevelopment area.

Line H is being extended north, with Corrientes - Las Heras (2·0 km, 2 stations) opened December 18 2015, and on to Julieta Lanteri-Facultad de Derecho (0·8 km) on May 17 2018. A 2·4 km extension of Line E from Bolivar to Retiro opened on June 3 2019, adding three stations.

Buenos Aires Metro
LineDirectionkmstapowerOpenLast extendedNotes
A centre-west 0 9·4 16 1·5kV DC OHLE 1913-12-12 2013-09-27  
B centre-northwest 11·8 17 550V DC 3rd-rail & OHLE 1930-10-17 2013-07-26 OHLE fitted, 3rd rail also in use
C north-south (central) 0 4·5 9 1·5kV DC OHLE 1934-11-09 1936-02-06  
D centre-north 10·5 16 1·5kV DC OHLE 1937-06-03 2000-04-27  
E centre-southwest 11·9 18 1·5kV DC OHLE 1944-06-20 2019-06-03  
F southwest-northeast (8·6) (13)   planned   preliminary engineering
H north-south (west) 0 8·8 12 1·5kV DC OHLE 2010-12-06 2018-05-17 3 km extension to Retiro planned
P southwest 0 7·4 17 750V DC OHLE 1987-04-28 ’pre-metro’, or Line E2: light rail
U west (suburban) 25·5 23 600V DC 3rd-rail 1948   Urquiza line
Address
Bartolomé Mitre 3342
1201 Buenos Aires
Argentina
Phone
+54 11 5368 6800
Fax
+54 11 4866 3037
Email
info@metrovias.com.ar
Website
www.metrovias.com.ar
 

Traffic

YearPassenger journeys
(million)
data is for metro only
2020 74·0
2019 321·3
2018 337·7
2017 317·7
2016 302·8
2015 no data
2014 242
 

Network data

Metro

Gauge
1435 mm
Length
56 km
Electrification
56 km - 1·5 kV DC
Rolling stock
645 Metro cars

Urquiza line

Gauge
1435 mm
Length
27 km
Electrification
27 km - 600 V DC 3rd-rail
Rolling stock
108 EMU cars

Light rail

Gauge
1435 mm
Length
7·4 km
Electrification
7·4 km - 750 V DC
Rolling stock
12 LRV/tram cars