First line opened 1876. Network of conventional tramways with eight operating routes serving 163 stops. See Bremen network map.

Bremen’s tram extensive network includes sections of segregated light rail, some constructed as part of original plans to develop a metro. An extension to Falkenberg (Niedersachsen) opened on August 1 2014 (5·5 km, 10 stops). Other extensions are in planning.

In June 2017 BSAG ordered 67 Siemens Avenio trams.

Address
Flughafendamm 12
28199 Bremen
Germany
Phone
+49 421 5596 0
Fax
+49 421 5596 302
Email
info@bsag.de
Website
www.bsag.de
 

Traffic

Passenger journeys
105 million (all modes)
Information year
2019
 

Network data

Gauge
1435 mm
Length
79·0 km
Electrification
79·0 km - 600 V DC
Rolling stock
123 LRV/tram cars (76 GT8N Adtranz/Kiepe, 43 GT8N-1 cars Bombardier Flexity, 4 GT8N-2 Siemens Avenio)