The GZIR line is the first of several express links planned as part of the Pearl River Delta Rapid Transit network. It connects New Guangzhou with Xiaolan, Zhuhai and Zhuhai Airport. The initial 117 km Guangzhou -- Zhuhai mainline section and 26 km Xinhui branch opened in January 2011. A 35 km extension to Zuhai airport is under construction for completion in 2016, linking to Macau's transit system at Hengqing.

Address
Guangzhou
China
Gauge:
1435 mm
Length:
187 km
Electrification
187 km - 25 kV 50 Hz