By Dipl-Ing Torsten Bode, Dipl-Ing Arnold Pieringer 2007-04-01T18:34:00
Rheda 2000 ballastless track has been used in all station areas and pointwork on Taiwan's high speed line. The track design was adapted to suit the elevated structure and seismic protection standards. Special slab designs had to be developed to meet specific alignment constraints
Get access to print and online content subscribe today
Site powered by Webvision Cloud