Annaba Tram
Two-line 21·7 km, 35 stop light rail network planned. Some construction work is under way, and the system will require a fleet of 72 LRVs. Line 1 would link Kouba in the north to main station and city centre, then continue south to El Bouni. A second line would start ...
-
Organisations
Mostaganem Tram
Two-line 14·2 km, 24-stop light rail network opened February 2023. Under construction since August 2013, test running began at the end of 2020. Opening was planned for early 2021, then postponed to 2022, but took place on February 18 2023. Line T1 runs from Lycée Oukraf Mohammed at La Salamandre, ...
-
-
-
Organisations
Sidi Bel Abbès Tramway
Opened 2017, Algeria’s fourth tram system. Single line serving 25 stops. The line runs from Les Cascades to the east of the centre via the university to the new north station, from where it returns south via the city centre (crossing the line to Les Cascades) and continuing southwest to ...
-
Organisations
Ministry of Public Works & Transport, Algeria
The responsibilities of the Minister relate to all matters concerning rail, road, air and sea transport. Address1 Chemin Ibn Badis El Mouiz (ex Poirson)El Biar16030 AlgerAlgeriaPhone+213 23 05 93 85E-mailcontact@mt.gov.dzWebsitewww.mt.gov.dz
-
Organisations
Oran Light Rail
Opened 2013. Single route serving 32 stops. Work on Line 1 began in December 2008, with the route opening on May 1, 2013, running from Es Senia in the south via the city centre and station, then east to Sidi Maarouf bus station. Operation and maintenance is by the Setram ...
-
Organisations
Ouargla Tramway
Opened 2018; single tram route serving 16 stops. An initial section of tram from Chenine (Kadour) east via the university district to Sid Rouhou (Cité Administrative) was inaugurated on March 20, 2018 (9·7 km, 16 stops). An extension north from Sid Rouhou to El Kasr / city centre loop is ...
-
Organisations
Sétif Tramway
Single light rail route opened 2018, serving 26 stops. Work began on May 8 2014 with opening on May 8 2018. The line runs from 11 Décembre 1960 in the east via the rail and bus stations to reach two western branches serving Université El Bez at Berchi Abid and ...
-
Organisations
Constantine Tramway
Opened 2013. Single tram line serving 21 stops. See Constantine network map. Work began in 2007, with the initial section from Ben Abdelmalek in the city centre south to Zouaghi Slimane opening on July 4 2013 (7·8 km, 10 stops). On July 30 2015, a contract was announced to build ...
-
Organisations
Entreprise du Metro d’Alger
‘Y’-shaped metro network serving 19 stations, plus light rail line serving 37 stops; both opened 2011. See Alger network map. Metro construction started 1989; initial section (9·5 km, 10 stations) opened in November 2011, with extension east to El Harrach on July 5, 2015 (4·0 km, 4 stations). The northern ...