Nur-Sultan (Astana) LRT

Work began on the 1520 mm gauge network on 4 July 2011 (41·8 km, 27 stops), but was cancelled in 2014. However in 2015 an agreement was signed with Chinese contractors, with construction restarting in 2017 for opening in 2020. The first phase from the airport to main station (22·4 ...