First line opened 1977; network comprises 3 lines with 36 stations. Work on a northern extension of the Yunusobod Line from Shahriston to Turkiston (3·6 km, 2 stations) has resumed having stopped in 2001. The elevated Sirgili Line (7·1 km, 6 stations) is under construction, interchanging at Olmazor with the south end of the Chilonzor Line.

Address
Prospekt Uzbekistanskii 93A
700027 Toshkent
Uzbekistan
Phone
+998 71 233 8921

Traffic

Passenger journeys:
61.6 million
Information year:
2017
Gauge:
1524 mm
Length:
37 km
Electrification
37 km - 825 V, DC 3rd-rail
Rolling stock
212 Metro cars