All Konya articles
-
Organisations
Konya Rayli Sistem Müdürlügü
Opened 1992; two-line network with 41 stops. See Konya network map. Konya’s first line opened in 1992, and was extended in 1996 (21·1 km). Line 2 opened September 29 2015 from the loop at Alaaddin east to Adiye (4·4 km, 6 new stops), including a 1·8 km catenary-free section; further ...