By Railway Gazette International and CMAJ2000-06-01T10:00:00
FRENCH engineering groups Travaux de Sud Ouest and Société Européenne de Travaux Ferroviaires last month completed laying ballastless track through the 7·8 km tunnel that will carry TGV Méditerranée on the approaches to Marseille, using a new design of vibration-absorbing twin-block sleeper developed by Sateba.
Already have an account? LOG IN
You’ve reached your limit of content for the month