EAST JAPAN Railway has completed the first trial runs with its ’environmentally-friendly’ New Energy Train, a hybrid diesel-electric railcar designated Series E991. The tests were conducted on the 40 km Utsonomiya - Nikko line. The 19·5m long 1067mm gauge vehicle has a top speed of 100 km/h. It is driven by a 95 kW induction motor, using VVVF inverter controls. Power is supplied by a 10 kWh lithium-ion battery, which stores regenerated braking energy. This can be topped up by a 180 kW induction generator driven by a 331 kW diesel engine operating at 2100rev/min, or by a fuel cell in the longer term.
- News
- In depth
- Events
- Data
- Maps
- Tenders & Jobs
Tender No. 42244 For the Manufacture and Supply of Turnouts and Tracks Geometry Measurement Trolley (“Tender”)
RFP No. 42247 Provision of Consulting Services in Various Railway Fields for Israel Railways (RFP)
Tender 42230 - Supply of Forklifts and Reachstacker for ISR’s Cargo Division
Timetabling & Track Possession System (“Tender”)
- Sponsored content
- Insights









