By Railway Gazette International2002-02-01T11:00:00
ISRAEL RAILWAYS has called tenders for a preliminary design study into the electrification of its entire network, totalling 700 route-km. Previous proposals had only envisaged wiring the 320 route-km passenger network radiating from Tel Aviv, but the new plan would include the heavy-haul freight routes in the south of the ...
Already have an account? LOG IN