Automatic block for Gijón to Pravia line

RENFE metre gauge Class 2400 DMU at Arriondas on a Oviedo to Santander service (Photo Mike Bent).

SPAIN: Infrastructure manager ADIF has awarded Alstom and Técnicas Eléctricas Asturianas a €25m, 13-month contract to upgrade the signalling and train control systems on the 51 km single track electrified metre gauge line between Gijón, Aviés and Pravia.

Please sign in or register for free to view this page

 

Sub Advert

You have reached your limit of news stories for this week. Register for FREE to read this article and get:

  • Unlimited access to online news coverage from:
  • Railway Gazette International covering the global railway industry
  • Metro Report International covering the urban transport sector
  • Rail Business UK industry news for the British railway market
  • Weekly e-mail newsletters covering the sector(s) of your choice
  • Exclusive offers for Railway Gazette Events.

If you are already a registered user or a subscriber you can SIGN IN now