Well wagon acquired for 200 tonne loads

TAZARA 200 tonne well wagon loaded with concrete blocks for testing

TANZANIA: Tanzania-Zambia Railway Authority has taken delivery of a 200 tonne capacity well wagon which will be used to transport abnormal loads such as turbines for the construction of the Julius Nyerere hydroelectric power plant.

Please sign in or register for free to view this page

 

Sub Advert

You have reached your limit of news stories for this month. Register for FREE to read this article and get:

  • Increased access to online news coverage from:
  • Railway Gazette International covering the global railway industry
  • Metro Report International covering the urban transport sector
  • Rail Business UK industry news for the British railway market
  • Weekly e-mail newsletters covering the sector(s) of your choice

If you are already a registered user or a subscriber you can SIGN IN now