2012-11-28T05:00:00
SPAIN: Under the Mediterranean Corridor project to create a 1435 mm gauge freight route over the 1300 km between Figueres and Algeciras (RG 5.12 p30), engineering consultancy Ineco is currently undertaking design studies for dual-gauging the existing route between Castellbisbal on the outskirts of Barcelona and Tarragona.
Site powered by Webvision Cloud