Mock-up verifies Stadler’s Gotthard train design

Impression of Stadler Giruno trainset for Swiss Federal Railways (Image: SBB).

SWITZERLAND: Stadler Rail and Swiss Federal Railways are using a full-size wooden mock-up to verify the planned interior design of the 29 Giruno trainsets ordered in May 2014 for use on services from Basel and Zürich to Milano via the Gotthard base tunnel.

You’ve reached your limit of content for the month

Get enhanced access to Railway Gazette news and weekly newsletters.

Register for free now