Urban transport project news – Page 55
-
NewsNext phase of Delhi metro Line 7 inaugurated
INDIA: The next phase of Delhi metro Line 7 was inaugurated on October 31. The elevated 17·9 km section between Shiv Vihar and Trilokpuri Sanjay Lake has 15 stations including three interchanges and a depot at Vinod Nagar. The Shiv Vihar – Trilokpuri Sanjay Lake section is not yet connected ...
-
NewsLoan agreement signed for second phase of Jakarta metro
INDONESIA: The government has signed an agreement for a 40-year, ¥70bn loan from Japan International Cooperation Agency for the second phase of the Jakarta metro. The agreement signed on October 24 specifies Japanese rolling stock and signalling suppliers. Letters of invitation for consulting services are due to be issued ...
-
Metro Report InternationalChangchun adds light rail line
CHINA: The third line of Changchun’s light rail network opened on October 30. Line 8 runs north from the northern terminus of metro Line 1 at North Ring Road to Guangtong Road. Services on the elevated 13·3 km route with 12 stops run every 10 min from 06.00 to 21.00, ...
-
Metro Report InternationalExpanded PATH station opens at Harrison
USA: An expanded metro station opened at Harrison, New Jersey, on October 30, serving the Newark branch of the PATH metro network which links Lower Manhattan with destinations across the Hudson River. Harrison station serves a growing development zone just across the Passaic River from Newark city centre; this includes ...
-
NewsSutton Link tram or bus rapid transit consultation opens
UK: Transport for London has began public consultation on the Sutton Link proposal for a tram or ‘zero emission’ bus rapid transport route linking the borough of Merton with Sutton town centre in south London. This is intended to make journeys by public transport quicker and more attractive, reduce the ...
-
Metro Report InternationalGovernment confirms £350m loan for Crossrail
UK: The Department for Transport is to provide £350m of short-term repayable financing to the Mayor of London for the year 2018/19 to cover additional work required for the Crossrail project, Rail Minister Jo Johnson announced on October 26. The funding is intended as an interim measure as discussions ...
-
NewsTram-train service to Rotherham launched
UK: Passengers aboard the 10.35 departure from Rotherham Parkgate on October 25 made history as they rode the first tram-train in revenue service in the UK. Opening of the Sheffield – Rotherham tram-train route marks the culmination of a pilot programme more than a decade in the ...
-
NewsLimmattalbahn rolling stock supplier selected
SWITZERLAND: Aargau Verkehr has selected Stadler to supply eight Tramlink light rail vehicles for the Limmattalbahn line being developed to the west of Zürich. Aargau Verkehr is ordering the vehicles under a joint procurement with Baselland Transport, which is to receive 10 for the Waldenburgerbahn line. Aargau ...
-
Metro Report InternationalNewcastle tram testing begins
AUSTRALIA: Powered testing started on the tram route in Newcastle on the night of October 22-23. Daytime testing is expected to commence in the coming weeks, with opening of the 2·6 km route between Wickham and Pacific Park scheduled for early 2019. The first tram arrived last month. ...
-
Metro Report InternationalTianjin metro Line 5 opens
CHINA: Tianjin metro Line 5 began trial operations on October 22. Services operate between 6.00 and 23.40 every 6 min in the peaks and 7 to 8 min off-peak. The 35 km underground route runs from Danhebeidao in the north to Zhongyiyifuyuan in the south, serving 26 stations including ...
-
NewsSecond phase of driverless metro line opens in Istanbul
TURKEY: The second phase of the driverless metro Line M5 on the Asian side of Istanbul was inaugurated on October 21 with a ceremony attended by President Recep Tayyip Erdoğan and Mayor Mevlüt Uysal. The 9·5 km eastern extension adds seven stations between Yamanevler and Çekmeköy-Sancaktepe. The initial 10·5 ...
-
NewsGrand Paris Line 16 construction contract awarded
FRANCE: A €718·8m contract to build the eastern section Grand Paris Express automated metro Line 16 has been awarded to Salini Impregilo, Societé du Grand Paris announced on October 19. The Lot 2 contract covers the excavation of 11·1 km of tunnel, running from the junction for the Aulnay depot ...
-
NewsTEX Rail train on test at Dallas-Fort Worth International Airport
USA: The first of the Flirt trainsets which Stadler is supplying for the 43 km TEX Rail commuter route linking central Fort Worth with Dallas-Fort Worth International Airport has undergone dynamic testing at the airport. Testing between Dallas Fort Worth Junction and DFW Airport Terminal B station was undertaken with ...
-
Metro Report InternationalRiyadh Metro airport extension contract awarded
SAUDI ARABIA: The FAST Consortium which is building Riyadh Metro Line 4 has been awarded a contract to build a two-station extension to serve King Khalid International Airport. This will include a 1·5 km viaduct and two elevated stations with direct access to airport terminals 1/2 and ...
-
Metro Report InternationalConstruction of Taoyuan’s Green Line officially begins
TAIWAN: Construction of Taoyuan Metro’s Green Line was officially launched with a groundbreaking ceremony for a 9·8 km elevated section of the route in the Bade district on October 15. Mayor Cheng Wen-Tsan said the line would be the first route to be developed by the city’s municipal government, after ...
-
NewsVirtual view of Birmingham tram extension
UK: Transport for West Midlands has published two computer-generated fly-through videos showing the West Midlands Metro tramway extension to Centenary Square in central Birmingham. The 840 m extension is currently under construction for opening towards the end of 2019. The video clips are taken from a computer simulation used ...
-
Metro Report InternationalAdelaide tramway extensions open
AUSTRALIA: Two short extensions of the Glenelg tramway in Adelaide opened on October 13. One extension runs 1 km east along North Terrace from Adelaide Railway Station to Art Gallery, University and Botanic Gardens, and operates every day. The other runs 350 m north from Rundle Mall along King William ...
-
Metro Report InternationalAuckland City Rail Link fit-out contractor selected
NEW ZEALAND: Project promoter City Rail Link Ltd has selected the Systems Integration, Testing & Commissioning Alliance joint venture of RCR Tomlinson and design partners Opus International Consultants for the interim project alliance agreement covering railway systems for the City Rail Link project in Auckland. SITC will work with ...
-
Metro Report InternationalWork starts on Wien metro reconfiguration
AUSTRIA: A groundbreaking ceremony at the site of the future Matzleinsdorfer Platz station on October 8 marked the start of work on the reconfiguration of Wien metro Line U2 and new driverless Line U5. The event was attended by Transport Minister Norbert Hofer, Deputy Mayor Maria Vassilakou, city transport senator ...
-
NewsFirst Caen tram delivered
FRANCE: The first Citadis X05 tram arrived at the Fleury-sur-Orne depot in Caen on October 4, having left Alstom’s La Rochelle factory two days earlier. In November 2016 the city awarded Alstom a €52m contract to supply 23 trams for the 16·8 km three-line network which is ...













